Skip to content

Opening book details…

Can I read ARP101. OPS. CCI-PMT-RFI-ARA3A-01-110-EE-0006 FDAS Pre-Functionality Performance Test of Control Building Rev.01 2025 09 22 on EtoBox?

ARP101. OPS. CCI-PMT-RFI-ARA3A-01-110-EE-0006 FDAS Pre-Functionality Performance Test of Control Building Rev.01 2025 09 22 by osenajoanne77 is a document available to read on EtoBox.

What is ARP101. OPS. CCI-PMT-RFI-ARA3A-01-110-EE-0006 FDAS Pre-Functionality Performance Test of Control Building Rev.01 2025 09 22 about?

The document outlines a Request for Inspection (RFI) for the 42MWp Arayat 3A Solar Power Plant project, specifically for the pre-functionality performance test of the control building. It includes details on the inspection process, assessment criteria, and the status of the works, indicating that some works have been accepted while others require remedial actions. The document also lists the personnel involved in the inspection and approval process.

Author
osenajoanne77
Language
EN