Transformer Test Report for W13 Substation by gavinilaa is a document available to read on EtoBox.

What is Transformer Test Report for W13 Substation about?

This document summarizes the results of a site test at the W13 substation to replace transformers, protection panels, and batteries. It lists the equipment tested, including a 40MVA power transformer. It details the mechanical protection checks performed on the transformer and its terminals, flags, and monitoring devices. All tests were completed successfully on February 20, 2013 and signed off by personnel from the transmission and distribution department and Energo, the consultant.