Skip to content

Opening book details…

Can I read Drainage Sump Layout for Hydro Project on EtoBox?

Drainage Sump Layout for Hydro Project by Deep is a document available to read on EtoBox.

What is Drainage Sump Layout for Hydro Project about?

The document outlines the drainage/dewatering sump layout for the Upper Karnali Hydro Electric Project, specifically for a small hydro power station with a capacity of 2 x 1.0 MW. It includes details about the client, consultants, and the design and approval process. The layout plan is dated January 2015 and is intended for DPR purposes only.

Author
Deep
Language
EN