Can I read HDD Inspection Report for Pipeline Project on EtoBox?

HDD Inspection Report for Pipeline Project by pathakavinash2323 is a document available to read on EtoBox.

What is HDD Inspection Report for Pipeline Project about?

The inspection report details the HDD profile for the Deesa to Akhol Steel Pipeline Project, conducted by M/s IRM Energy Limited and M/s EDLIPSE Engineering Global Pvt. Ltd. The report includes measurements of distance, depth, and angle at various intervals along the 204-meter pipeline, with a maximum depth of 3.53 meters and a pipe diameter of 8 inches. Overall, the HDD operation appears to be within acceptable parameters with minor deviations noted in depth and angle.