Village Construction Status Report by praveen is a document available to read on EtoBox.

The document contains information about 35 villages listing the length of road cutting required, amount of manual cutting, use of JCB machines, construction of water tanks, and current status of projects. The lengths of road cutting range from 0 to 700 meters. Manual cutting was used in some villages from 20 to 300 meters. JCB machines were used in a few places from 100 to 100 meters. Water tanks are planned or under construction in most villages. Some tank projects are completed or for old tanks.