About this document
Water Supply Network Replacement Project by lenevo1011 is a document available to read on EtoBox.
The document outlines the replacement of a faulty water distribution network in Ram Colony and Pandav Colony in Kalyan, with a budget approved for the work. The project is technically sanctioned with a time limit of 100 days from the work order date. Measurements and specifications for the required materials and construction methods are detailed, including various pipe sizes and fittings needed for the project.
- Author
- lenevo1011
- Language
- EN