About this document
DYNAenergetics Firing Head Assembly Guide by mahsa is a document available to read on EtoBox.
The document provides a 9 step field assembly procedure for a DYNAenergetics 2-7/8 Pressure Activated Auto-Vent Firing Head. Key steps include: removing parts from packaging; clamping the firing head upper body in a vise; removing the initiator retainer and installing o-rings on the percussion initiator and inside the retainer; inserting the initiator into the retainer; screwing the retainer into the firing head body; and installing handling subs before removing from the vise. Proper handling and assembly o
- Author
- mahsa
- Language
- EN