Opening book details…
Can I read Safety Manual for 500kV Transmission Project on EtoBox?
Safety Manual for 500kV Transmission Project by myn maliQue is a document available to read on EtoBox.
What is Safety Manual for 500kV Transmission Project about?
This document outlines safety procedures for using an air compressor during clearing of rentice for a proposed 500kV double circuit transmission line project from Ayer Tawar to Bentong South. It identifies hazards, required personal protective equipment, necessary training, responsibilities of project staff, and a safe work procedure. The procedure addresses risks such as getting lost in the jungle, machinery toppling, insect bites, encounters with wild animals, and shortage of food/water, and controls thes
- Author
- myn maliQue
- Language
- EN