About this document
Turbine Erection and Blue Matching Guide by Mukesh Bhandakkar is a document available to read on EtoBox.
1. The document outlines the sequence of activities for erecting turbines including preparing the foundation, positioning sole plates, assembling casing parts, installing bearings and rotors, and completing alignments. 2. Key initial steps include measuring foundation bolts, grinding the concrete surface, and leveling sole plates which support the casing assembly. 3. Casing parts are then assembled through activities like blue matching surfaces, applying sealant, and checking parting plane levels and bo
- Author
- Mukesh Bhandakkar
- Language
- EN