Skip to content

Opening book details…

About this document

Crowborough Sewer Works Report by tj is a document available to read on EtoBox.

The document provides a report on Crowborough Sewer Works in Harare, Zimbabwe. It summarizes observations made of the various processes and units at the plant. Key points include: intake works are overloaded and receiving more flows than their design capacity; pre-settlement tanks have excessive sludge retention times and scum accumulation due to fermentation; biological trickling filters are also overloaded due to excess flows from intake works; and maturation ponds meant to handle overflow are showing sig

Author
tj
Language
EN