Can I read Banjar Panji No. 1 Well Analysis on EtoBox?
Banjar Panji No. 1 Well Analysis by rejosentono is a document available to read on EtoBox.
What is Banjar Panji No. 1 Well Analysis about?
The document discusses drilling and well control operations on the Banjar Panji No. 1 well. It finds that the rig, TMMJ No. 4, had extremely poor operating efficiency, with a ratio of 326.5 hours of drilling to 830.5 hours of downtime. It also finds issues with cementing of casing strings, a lack of proper job safety analyses, questionable leak off testing practices, improperly set casing depths, a lack of kick drills, and slow pump tests not being performed. Specific daily reports are analyzed that show pr
- Author
- rejosentono
- Language
- EN