Can I read PT Supreme Energy Maintenance Report on EtoBox?
PT Supreme Energy Maintenance Report by Novindra Putra is a document available to read on EtoBox.
What is PT Supreme Energy Maintenance Report about?
A maintenance inspection was performed on the HWP-A motor at the PT Supreme Energy Muara Laboh power plant. Vibration, temperature, and winding measurements were taken and found to be normal, though speed could not be checked due to unavailable devices. Post-inspection activities like permit closure and defect recording were completed. Charts of additional system measurements are attached. The inspection was performed by Novin and Obi and supervised as documented.
- Author
- Novindra Putra
- Language
- EN