Can I read LLB-12 13-3/8" Squeeze Design Report on EtoBox?
LLB-12 13-3/8" Squeeze Design Report by Ibnu Hasan is a document available to read on EtoBox.
What is LLB-12 13-3/8" Squeeze Design Report about?
This document provides a 13-3/8" squeeze cementing design for the PHE ONWJ rig with the ENSCO-67. It includes: 1) Well data including casing strings and depths 2) Slurry design including recipe, properties, and displacement volumes 3) Calculations for cement volumes and pumping schedule 4) Procedures for mixing, pumping, and displacing cement 5) Material costs for the job totaling $8,809.90
- Author
- Ibnu Hasan
- Language
- EN