About this document
CPWD DAR Vol I 14092023-Civil 111 by nr.bhavana is a document available to read on EtoBox.
The document provides detailed measurements and costs associated with various diameters of pipes and the loading/unloading of cement and steel from railway wagons. It includes quantities, rates, and total costs for labor and materials, along with applicable taxes and overheads. The final costs for 23 tonnes of cement and 44 tonnes of steel are calculated, with per tonne costs also provided.
- Author
- nr.bhavana
- Language
- EN