About this document
Tous Dam Overtopping Failure Analysis by sepuu is a document available to read on EtoBox.
The Tous Dam failure in October 1982 due to overtopping during an extreme flood led to significant changes in Spanish dam safety regulations, emphasizing the need for reliable energy sources and improved operational protocols. The dam, originally designed for a 500-year flood, was overwhelmed by a 1,000-year flood event, resulting in extensive flooding, casualties, and damages. Lessons learned from this incident prompted a comprehensive review of safety standards and the construction of a new dam with enhan
- Author
- sepuu
- Language
- EN