Skip to content

Opening book details…

About this document

Six Sigma in NPK Production Optimization by Febri Sandi is a document available to read on EtoBox.

PT Petrokimia Gresik operates 7 NPK fertilizer plants with a total production capacity of 2 million tons per year, which is much higher than the original design capacity. One plant, the NPK Phonska Plant II, was able to increase its capacity from 1,320 tons/day to 2,400 tons/day, or 182% of the original design, through simultaneous process optimization, equipment modifications, and operational improvements. The process optimization simplified the reaction path and reduced the process structure. Equipment wa

Author
Febri Sandi
Language
EN