Skip to content

Opening book details…

About this document

Dairi Construction Project Dayworks Report by mufqi fauzi is a document available to read on EtoBox.

The document is a dayworks sheet from PT Darma Henwa Tbk for their Daiki Construction Project with PT Daiki Prima Mineral. It details the equipment and labor used from May 14th to May 20th for culvert installation. A total of 7 excavators, 2 dump trucks, and 45 workers (8 leading hands, 13 skilled workers, 24 casual laborers) were used over the period. The total costs for equipment, labor, and materials for the culvert installation were Rp 18,322,872, Rp 5,364,225, and Rp 1,443,406,482 respectively.

Author
mufqi fauzi
Language
EN