The document provides a cost estimate for excavation and construction of the substructure for a shopping mall in Gurgaon, India. It includes estimates for excavation of 9,500 sqm to a depth of 9.4 meters, pouring 9,500 sqm of plain cement concrete at a cost of Rs. 72,70,000, constructing 114 column footings each 3m x 3m at a cost of Rs. 2,01,600, shuttering for 114 columns at a cost of Rs. 1,56,165, and building a 435m long retaining wall at a depth of 8.4m for a cost of Rs. 93,31,344. The total estimated c