Skip to content

Opening book details…

About this document

Pothole Area Calculations and Premixing by Amanulla Khan is a document available to read on EtoBox.

The document provides calculations for estimating quantities of materials needed for road repair work. It includes measurements and calculations for filling pot holes between 9-19 km, quantities for premixing between 8-13 km, and total areas of pot holes and premixing. Calculations show totals of 13.24 cubic meters for sealing coat, 7.74-19.97 cubic meters for different road sections to fill pot holes, and 43.03-147 cubic meters for premixing areas between road sections.

Author
Amanulla Khan
Language
EN