About this document
1.method Statement For Surveying Nepal Latest by rajiv somvanshi is a document available to read on EtoBox.
This method statement outlines the procedures for conducting a route survey for the 400 kV Double Circuit Transmission Line from Ratmate to New Damauli, including establishing control points, verifying alignment, and preparing data for approval. It details safety requirements, responsibilities of personnel involved, and the tools and methods to be used during the survey process. The document serves as a guideline to ensure compliance with project specifications and safety standards throughout the surveying
- Author
- rajiv somvanshi
- Language
- EN