About this document
Footbridge Project Execution Plan Aracaju by ScribdTranslations is a document available to read on EtoBox.
The document presents the Executive Project for the construction of a footbridge over Beira Mar Avenue, in Aracaju, developed by RW - Engineering Consultants S/S. Composed of seven volumes, Volume 4 details the Work Execution Plan and the measurement criteria, addressing aspects such as location, climate, technical characteristics, and materials used. The project aims to improve urban mobility and drainage in the region.
- Author
- ScribdTranslations
- Language
- EN