About this document
PMCC Ami Mk22 NCR Arc 0002 by frankstien7 is a document available to read on EtoBox.
This document outlines a Non-Conformance Report (NCR) regarding the use of unapproved painting materials by the contractor during internal painting works at the Wali Al-Ahd - Z project. The NCR requires closure within 15 days and includes sections for corrective actions, reviews, and closure signatures. The report is issued by Al-Mnabr Consulting Engineering and involves multiple parties including the National Housing Company and Dar Al Riyadh for Engineering Consulting.
- Author
- frankstien7
- Language
- EN