Rebar Schedule for Precast Duct Bank by manowar is a document available to read on EtoBox.

This document provides a reinforcing bar bending schedule for a sewage treatment plant project. It includes 9 items detailing the rebar size, shape, number of rebars, total length, weight, and other specifications for different structural elements of a U drain. In total, it schedules 176.931 tons of D10mm rebar and 67.5 tons of D12mm rebar, for a total of 244.432 tons of reinforcing bar needed for the 2500 meter long U drain.