Aditya Birla Undoo AnFS by Divanshu Goyal is a document available to read on EtoBox.
The document conveys the Administrative and Financial Sanction for the construction of one 132kV bay at 132kV GSS Undoo to provide 70MW connectivity to a Wind-Solar Hybrid Power Plant by M/s Aditya Birla Renewables Energy Ltd. The total estimated cost is Rs. 1,10,94,359.37 without overhead charges and Rs. 1,27,58,513.28 with overhead charges. The technical sanction for the work is to be issued by the Zonal Chief Engineer (T&C).