Skip to content

Opening book details…

About this document

TD 11580001 Requirement Prior To IQ OQ by Mariano Jonatan Fleitas is a document available to read on EtoBox.

This document outlines the requirements for environmental conditions and system specifications that must be met before conducting an Installation Qualification (IQ) and Operational Qualification (OQ) for BUCHI laboratory equipment. It includes criteria such as surface stability, temperature, humidity, and necessary utilities that need to be verified by a responsible person. The completed form must be returned to the IQ/OQ supplier to schedule the qualification appointment.

Author
Mariano Jonatan Fleitas
Language
EN