Can I read L-Shape Staff Residence Cost Breakdown on EtoBox?
L-Shape Staff Residence Cost Breakdown by Freedom Love Nabal is a document available to read on EtoBox.
What is L-Shape Staff Residence Cost Breakdown about?
The document provides a cost breakdown for construction of a L-shaped staff residence. It lists costs for various construction divisions including: - Substructure work such as excavation, backfilling and hardcore filling totaling 1,156,969.03 ETB - Concrete work such as formwork, reinforcement and cast in place concrete totaling 2,957,500.59 ETB - Masonry work such as stone foundation walls totaling 127,454.50 ETB The total cost for the project including contingencies and VAT is estimated to be 77,821,681.