Skip to content

Opening book details…

About this document

S. TX Vicksburg Well # 1: Actual Results by Mohamed Abd El-Moniem is a document available to read on EtoBox.

The well was completed as a tubingless well with 1,255,000 lb of ISP stimulation in 4 stages. It was isolated with composite bridge plugs and cemented intervals and cleaned out with a CTU. The largest stage placed 448,000 lb of proppant and averaged 11290 psi. Initial production was estimated at 9.8 MMSCFD with an average of 6.5 MMSCFD over the first 12 months.

Author
Mohamed Abd El-Moniem
Language
EN