About this document
S. TX Vicksburg Well # 1: Actual Results by Mohamed Abd El-Moniem is a document available to read on EtoBox.
The well was completed as a tubingless well with 1,255,000 lb of ISP stimulation in 4 stages. It was isolated with composite bridge plugs and cemented intervals and cleaned out with a CTU. The largest stage placed 448,000 lb of proppant and averaged 11290 psi. Initial production was estimated at 9.8 MMSCFD with an average of 6.5 MMSCFD over the first 12 months.
- Author
- Mohamed Abd El-Moniem
- Language
- EN