ROW Issues for Optical Fiber Cable Project by Engr Amir Jamal Qureshi is a document available to read on EtoBox.
This letter from the Deputy Director (East) of the Pakhtunkhwa Highways Authority discusses issues with excavation work carried out by a contractor for an optical fiber cable project along the Maqsood - Lora – Ghoragali Road. Specifically, the letter notes that the excavation and backfilling was not done properly, resulting in settlement of loose areas and water damage to the road. Open trenches were also left near the road surface, damaging it. As no work plan was shared with the Authority, routine road ma
- Author
- Engr Amir Jamal Qureshi
- Language
- EN