Ricky Putra Siregar, student with ID 1707165469 of the Transfer D3-S1 Chemical Engineering program in 2017, estimated the costs for a methanol factory fluid processing plant. The purchased equipment cost was $400,000. Direct costs totaled $1,440,000 including installation costs. Indirect costs were $491,520 including engineering, construction, and contingency. The total capital investment was estimated at $2,221,248 including working capital.