About this document
Saudi Aramco Wireline Logging Guidelines by Mahrouz Mado is a document available to read on EtoBox.
The document provides guidelines for wireline logging operations, including: - Logging should be done as soon as possible after drilling to minimize mud filtrate invasion. Dual LWD and wireline logging is recommended. - Mud samples should be collected before and after logging and sent for analysis. - When a downhole tool malfunctions, consult reservoir engineers before deciding whether to continue logging. - Non-radioactive tools like sonic or resistivity logs should be run before radioactive tools
- Author
- Mahrouz Mado
- Language
- EN