About this document
Request for Installation Materials by Micah Arevalo is a document available to read on EtoBox.
Santo Tomas Deep Well Drilling Services requests materials from Ritz Builders Construction Inc. for a well installation project in Boston area. The request lists 14 specific materials needed, including a 5 HP submersible pump, 60 meters of royal chord cable, 50 meters of sensor cable, electrical and rubber tape, a control panel, circuit breaker, polyethylene hose, adapters, couplings, elbows, and nipples. The driller Sonny Arevalo signs off, asking for the materials to complete the well installation.
- Author
- Micah Arevalo
- Language
- EN