Opening book details…
Can I read Hydropower Project Cost Estimates on EtoBox?
Hydropower Project Cost Estimates by walitedison is a document available to read on EtoBox.
What is Hydropower Project Cost Estimates about?
This chapter provides cost estimates for two schemes to develop the Villa Siga Hydropower Project. Scheme 1 involves tunneling the entire length of the headrace tunnel. Scheme 2 involves 49.5% tunneling and 50.5% following the natural contour for the headrace. The total project cost for Scheme 1 is PHP 2,039,230,500 for an 11.5 MW plant and PHP 2,157,630,500 for a 16.5 MW plant. The total project cost for Scheme 2 is PHP 1,929,460,600 for an 11.5 MW plant and PHP 2,048,460,600 for a 16.5 MW plant. The metho
- Author
- walitedison
- Language
- EN