About this document
Daily Drilling Report for Amal-18 STA by eng7mohamed7hashim is a document available to read on EtoBox.
The daily drilling report provides an update on operations for well AMAL-18 STA. Key details include: - Drilling reached a depth of 6150 feet by sweeping the hole and displacing it to oil-based mud. - The plan for the next 24 hours is to wiper trip, displace the hole to oil-based mud, and continue drilling the 8 1/2" hole. - Operational status is currently sweeping the hole with tandem pills to clean the shakers before spotting high-vis fluid on the bottom.
- Author
- eng7mohamed7hashim
- Language
- EN