Can I read From 300 SR To 400 SR/M With Materials From 100 SR To 120 SR/M Without Materials on EtoBox?
From 300 SR To 400 SR/M With Materials From 100 SR To 120 SR/M Without Materials by kassem charanek is a document available to read on EtoBox.
What is From 300 SR To 400 SR/M With Materials From 100 SR To 120 SR/M Without Materials about?
The document provides cost estimates for different construction phases: skeleton construction is estimated between 100-120 SR per square meter without materials but 300-400 SR with materials, while finishing work is estimated at 800-1000 SR per square meter which includes the cost of materials.
- Author
- kassem charanek
- Language
- EN