What is Thermal Power Plant Cost Analysis about?

To generate 1 million units (1MU) of electricity from a thermal power plant with a capacity of 1000 MW, the plant would need to operate for 365 days at 24 hours per day with an availability factor of 100% and a plant load factor of 85%. This would generate 7446 MU per year. The levelized tariff to generate this electricity would be Rs. 1.817 per kWh, calculated based on the plant