In the event of a total AC power failure or UPS failure at the power plant: 1. Diesel generators will start automatically to power emergency systems, but may require manual start if failed. Emergency procedures are enacted including starting oil pumps and fans. 2. Restoring main power involves charging buses sequentially from backup power sources and synchronizing diesel generators. 3. Additional actions include starting water pumps, tripping the turbine if needed, isolating non-critical equipment, and