Skip to content

Opening book details…

About this document

Pipeline Profile and Man-Hour Estimation by Prasad is a document available to read on EtoBox.

This document provides a summary of items and quantities for a pipeline project for the Sharafco Storage Terminal at Hamriya Free Zone. It includes 11 items related to pipeline design such as datasheets, drawings, and stress analysis. The estimated man-hours for engineering work are 533 hours using software including Caesar. Exclusions from the scope of work are noted as site survey, inspection of existing pipe thickness, fabrication, commissioning, and construction/erection. Input documents required from t

Author
Prasad
Language
EN