Skip to content

Opening book details…

About this document

Inspection Assignment Procedure Guide by ANIL PLAMOOTTIL is a document available to read on EtoBox.

This document provides procedures for shop inspection and testing for the Ras Markaz Crude Oil Park Project Phase 1. It outlines responsibilities for quality assurance and control. Inspection classes and requirements for material certification are defined. Notifications will be provided, and inspection assignments prepared and transmitted to nominated inspectors. Inspection reports and non-conformance reports will be generated. Access for inspections and procedures for spare parts are also covered. Attachme

Author
ANIL PLAMOOTTIL
Language
EN