About this document
Piping Material Take Off Process by satish04 is a document available to read on EtoBox.
The document outlines the steps for a piping material take-off (MTO) which includes studying piping specifications and piping and instrumentation diagrams (P&IDs), marking discrete piping components on the diagrams with specification information, guessing pipe layout details like lengths and elbows, and tabulating piping components by type, size, class, and specification in preparation for the material take-off.
- Author
- satish04
- Language
- EN