Can I read Atlas Phase II Cost Breakdown on EtoBox?

Atlas Phase II Cost Breakdown by civilmesfin99 is a document available to read on EtoBox.

What is Atlas Phase II Cost Breakdown about?

The document provides a detailed cost breakdown for various work items in the Atlas Phase II finishing project, including cement screed, ceramic flooring, and marble flooring. Each work item includes material, labor, and equipment costs, resulting in total unit costs ranging from 171.58 Birr/m2 to 1204.03 Birr/m2. The document also outlines profit margins and overhead costs associated with subcontractors.

Author
civilmesfin99
Language
EN