About this document
FM TPSG 903 P 032 by zwinmyint75 is a document available to read on EtoBox.
The document is a Flange Management Traceability Matrix for the PETROBRAS P82 FPSO project, detailing various flanges, bolts, and joint specifications. It includes torque values, joint statuses, and inspection details for multiple flange connections. The document serves as a record for mechanical completion and inspection processes.
- Author
- zwinmyint75
- Language
- EN