About this document
Mae Suai Dam Leakage and Repairs by MaxMaximum is a document available to read on EtoBox.
1. Mae Suai Dam experienced leakage issues after its first year of operation due to differential settlement between the earth-filled section and RCC section. Repair works were conducted but leakage continued to increase annually. 2. In 2014, the dam performed well during a 6.3 magnitude earthquake with a maximum PGA of 0.33g recorded, though some cracks formed in the RCC blocks above maximum water level. 3. Despite the dam
- Author
- MaxMaximum
- Language
- EN