Skip to content

Opening book details…

About this document

Pre-Concrete Survey Protocol for Foundations by Renu Tekumudi is a document available to read on EtoBox.

The document appears to be a survey protocol for laying the foundation of an external pipe rack structure before pouring concrete. It includes a basic schematic of pile dimensions and locations, with 6 piles arranged in 2 rows of 3 piles each, ranging from 150mm to 300mm in diameter. The total outcrop and bottom dimensions are provided as 2400mm. Reference is made to additional drawing numbers. Notes specify that all dimensions are in millimeters and the sketch is not to scale, and mentions bolt diameter in

Author
Renu Tekumudi
Language
EN