Can I read Function Hall Construction Cost Estimate on EtoBox?
Function Hall Construction Cost Estimate by aishapagayao1422 is a document available to read on EtoBox.
What is Function Hall Construction Cost Estimate about?
This document contains a bill of materials outlining the estimated costs for the proposed construction of a 1,008 square meter function hall. It includes costs for site works, earthworks, concrete works, masonry works, rebar works, finishing works, electrical works, and plumbing works. The total estimated material cost is P915,403.13, the total estimated labor cost is P187,978.59, and the total estimated construction cost, including a 10% overhead charge, is P1,213,719.89. The bill of materials was prepared
- Author
- aishapagayao1422
- Language
- EN