About this document
Göpfert Machine Project Management Guide by AngelRodriguez is a document available to read on EtoBox.
The document provides information on connection requirements for a project management system. It details the necessary electrical, internet, water, and compressed air connections. Electrical power should be a 3-phase 400V connection. Recommended water pressure is 4 bar at 35°C with mineral levels between specified amounts. Compressed air must be dry, oil-free, and filtered with a minimum pressure of 6 bar. Remote maintenance can be enabled via a VPN tunnel requiring an outbound HTTPS connection on port 443
- Author
- AngelRodriguez
- Language
- EN