About this document
Geotechnical Investigation Report: MTHL by Hemant Yesaji is a document available to read on EtoBox.
The document summarizes a geotechnical investigation carried out by S & R Geotechniques Pvt. Ltd. in Navi Mumbai for the Mumbai Trans Harbour Link Project. Bore hole Z5-597A was drilled at pier MP243-RHS to a total depth of 15 meters below ground level between April 15-18, 2019. The bore log details the lithology encountered with depth, including grayish colored soft marine clay from 1-1.95 meters.
- Author
- Hemant Yesaji
- Language
- EN