Skip to content

Opening book details…

About this document

Optimal 5-1 Planning for Construction by Jawad Ahmad is a document available to read on EtoBox.

This document presents a multi-objective optimization model for planning and scheduling repetitive construction projects. The model aims to generate optimal construction plans that minimize project duration while maximizing crew work continuity. It consists of three modules: 1) a scheduling module that develops practical schedules, 2) an optimization module that identifies tradeoffs between duration and continuity using genetic algorithms, and 3) a ranking module to select the best overall plan based on mul

Author
Jawad Ahmad
Language
EN