About this document
Work Inspection Request Overview by Rejoy Baby is a document available to read on EtoBox.
This document contains two work inspection requests for the Midfield Terminal Building project at Abu Dhabi International Airport. The first WIR is for inspecting fabricated additional column material to check for compliance before erection. The second WIR is for inspecting drilled hole depths in the GRC Corridor. Both inspections are scheduled for January 17, 2016 and involve verifying that the work meets specifications and approved drawings. The contractor and engineer will sign off on the inspections.
- Author
- Rejoy Baby
- Language
- EN