About this document
Pier 13 Development Update by Chowdhury Priodeep is a document available to read on EtoBox.
This document contains pile driving test results for two piles. Pile 1 was driven to a depth of 27.10 meters with a velocity of 2.398 cm/s. Pile 2 was also driven to 27.10 meters, and had a velocity of 2.381 cm/s. Both piles had a diameter of 120 cm and an L/D ratio of 23.
- Author
- Chowdhury Priodeep
- Language
- EN