Skip to content

Opening book details…

Can I read Ground Building Construction Guidelines on EtoBox?

Ground Building Construction Guidelines by Nilashis Roy is a document available to read on EtoBox.

What is Ground Building Construction Guidelines about?

1. The letter discusses construction requirements for a residential building project in Newtown, Kolkata. Concrete testing procedures are outlined, requiring 6 cubes to be made and tested at 7 and 28 days for each concrete pour. 2. Ordinary Portland cement should be used for superstructure works to allow for standard removal times of shuttering. Pozzolana cement gains strength slowly and may not meet strength requirements at 7 and 28 days. 3. Concrete mixes must be finalized by testing cubes at 7 and 28 da

Author
Nilashis Roy
Language
EN